How we work

A robotic cell is decided long before it is built: in the plant visit, the gripper, the simulation and the test at our plant. Those steps stay with our own engineers, from the first visit to the service call years later. These are the nine capabilities they are made of, and the loop they form.

One team, from the first visit to service

Every cell we deliver goes through the same eight steps, in the same hands. Nothing that decides how the cell runs is handed to a subcontractor, so the engineer who simulated your cycle is the one who runs the FAT, and the one you reach when something stops.

  1. 01

    Investment consulting

    It starts in your plant, not at a drawing board. We look at how parts are loaded today, what the machine waits for, and what a robot would have to earn back, and we simulate the cell before we quote it. A feasibility study can end with a no.

    Investment Consulting Simulation

  2. 02

    Project management

    After the order we work in weekly cycles: plan, update, review, next steps. The project board is shared with you, change requests are written down, and every milestone is one the cell can be tested against, on the way to the FAT and the SAT.

  3. 03

    Mechanical and electrical engineering

    The frame, the gripper, the conveyors, the guarding and the control cabinet are designed by our own engineers. What is only metalwork, such as sheet metal and welding, we buy from specialists.

    Design

  4. 04

    Software and vision

    IROVISION finds the part, System Manager shows the cell. We write both, and the PLC and robot programs, so when your part changes, the people who wrote the code are the people you call.

    Software Development Measurement

  5. 05

    Robot integration

    The robot is chosen after the process is understood: payload, reach and speed for your part, and the sensors that confirm every grip before the machine is allowed to start.

    Robotics Mobile Robotics

  6. 06

    Assembly and FAT

    The cell is built on one frame at our plant and runs its full cycle there with your parts: the factory acceptance test. We put it through the test ourselves before your team sees it, and your team is trained during it, by role.

    Why we take FAT so seriously

  7. 07

    Commissioning and SAT

    The cell ships in one piece, is set down at your machine and commissioned by our engineers. The site acceptance test confirms it in your production, with your parts and your operators.

    Working with a team in Türkiye

  8. 08

    Service

    Secure remote access, critical spare parts planned with you, preventive maintenance and engineers on site when a problem needs hands. We design a robotic cell to run for 15 years, and we keep learning from it: that is where the next product comes from.

    Service R&D

The factory acceptance test of a transfer machine cell at our plant: parts on the backlit belt, the robot picking one, the stand-in jaws of the machine beside it.
A transfer machine cell at our plant, before its factory acceptance test. The machine is stood in for by jaws that behave like it.

How a project is run

Between the order and the handover, four habits keep a project honest.

  1. 01

    A weekly cycle

    Plan, update, review or demo, next steps. Small steps, so a wrong assumption about your part costs a week, not a quarter.

  2. 02

    A board you can see

    The project board is shared with you. Change requests are written down and agreed before they are built, and risks are listed early, while they are cheap.

  3. 03

    Milestones that can be tested

    A milestone is a function the cell can show, not a date on a chart. The last two are the factory acceptance test at our plant and the site acceptance test in your production.

  4. 04

    Proven before it travels

    The cell runs its full cycle with your parts at our plant, in front of your team, before it ships. On site it is commissioned by the same engineers.

A feasibility study can also end with a no. Read how we think about a robot project.

Tell us about your part

Send us your part, your machine and your volumes. We will look at them with you and tell you whether a robot pays off, and which step comes first.